AGC were contracted to transform the space into a fit-for-purpose tier 3 data hosting facility based on the ‘Uptime Institute’ tier rating system. This design and construct project was designed to meet the following client requirements:
- Cater for the maximum number of racks in the available space
- Security measures to support sensitive equipment racks
- Decoration and finishes of the rooms
- Fire retarding walls and doors
- Access control system
- Precision air cooling within the equipment room
- CCTV Surveillance System
- Physical Security
- Power systems
- Cabling systems
- Fire protection systems