Calvary Christian College Technology Centre

Our Works

A.Gabrielli Construction’s began works at Calvary Christian College in late August 2012. Our scope of works upon award of the project consisted of the following:

  • Construction of a new Technology Centre
  • External works including paths & ramps
  • Civil works including site cut & fill and stormwater infrastructure
  • Hydraulic Works including sewerage & water supply
  • Electrical Works
  • Mechanical Works
  • Construction of woodwork & metalwork room to incorporate benches and welding bays which was finished with plywood sheeting to the walls and plasterboard cladding above. Services cable trays were run overhead through these rooms with electrical PowerPoint cables and air supply to connect to. Floors were epoxy teraflake coating
  • Construction of Dust Extraction System
  • Construction of welding bay and spray booth in an outdoor fabrication area which ran an impervious metal wall sheeting internally
  • Construction of PWD’s and toilets
  • Construction of Storage rooms incorporating shelving
  • Construction of Design room with carpet floor covering, FC Walls and perforated grid panel ceiling

Outcome

The project at Calvary Christian College was a major success for all those involved. The Technology Centre was appealing within the school environment through the array of different vibrant colours and the use of attractive building materials such as the combination of Colorbond cladding, FC sheeting and exposed timber rafters on the interior and exterior. The internal plywood was featured in the Metalwork & Woodwork rooms which portrayed a natural representation look.