Construction of 10,000m2 container hardstand for a 160t point load container stacks and 40t forklifts. Works were completed in 3 stages to maintain accessibility to the stacks
throughout.
The project included:
• Clear and level
• Excavation, testing, and compaction of base
• Concrete: 600mm s40 strip footings and 300mm s40 driveway.
• Construction of a 400m2 bioretention basin including trash pits and plantings.